Stone products manufactured in the Greater Toronto Area
info@everbuildmaterials.ca416-970-6288Mon to Fri, 7:00 to 17:00
Production route · Six stages

Your stone order, step by step.

You approve the slab and shop drawing. We cut, finish, inspect, label and prepare every piece for your installer.

Two approval pointsQC record at release
Production ticket6 stages
Approved drawing to labelled stone.
Selection and layout approveCut and finish produceInspect and pack release
MaterialDrawingDispatch
Your approvalSlab and shop drawing
Our workCut, finish and inspect
Order recordPiece labels and QC sheet
InstallationHandled by your own trade
Production route

Every stage has a clear output.

Durations are typical working ranges. The quote and approved schedule control the dates for your project.

01

Choose and reserve the slab

Select from stock or source to specification. Natural slabs are photographed and recorded by batch.

OutputReserved slab list and photos
Typical1 to 3 days
ApprovalRequired
02

Approve drawings and layout

We check dimensions, place pieces on the slab and return seam and vein decisions for sign-off.

OutputShop drawing and nesting plan
Typical2 to 4 days
ApprovalRequired
03

Cut the pieces

Bridge saw, 5-axis or waterjet cutting follows the approved nesting order and fixture details.

OutputCut pieces before finish
Typical2 to 5 days
04

Finish surfaces and edges

Profiles and finishes are matched across the run, with hand work where the transition needs it.

OutputFinished pieces
Typical2 to 4 days
05

Inspect every piece

Critical dimensions, cut-outs and finish are checked against the approved drawing.

OutputQC record and measurements
Typical1 day
06

Protect, label and dispatch

Pieces are packed for the route and labelled so the installer can unpack in drawing order.

OutputLabelled crate and packing list
Typical1 day
Before production

Changes are easiest before approval.

Seams, grain direction, fixtures, edges and finish should be settled on the shop drawing. Later changes can affect material, price and schedule.

Ready to begin

Send the current drawing set.

  • Project location and required date
  • Material, quantity and finish
  • Fixture models and access notes
Send drawings for a quote